Ziggy and Frank reinstalled a refurbished grate at the mid-dike water control structure. They had the work done at Cavalier Steel Yard in Acton and painted the grate at Weir hill. The gate was so rusted that it could not be opened. Cherrie Corey took the photo.
No comments:
Post a Comment